Wednesday, April 10, 2013

Tucson Spring Building - (Day 20)



4/10/13 (Wednesday) -  Weather: cool weather, feel like 72 degree

Both of us woke up with ache all over in our body, because we were working like crazy yesterday.  We did not got up until past 8:00a.m. Then we have cinnamon toasters cereal with milk for breakfast.

Tom started putting metal angle brackets to anchor the roof deck. He used 8 screws on each one. There is a total of 16 metal angle brackets.


 We needed to move all the 3/4 thick OSB  onto the roof of our shed. We set up the 2x10x8 woods as platform on both ladder. We clamped to the ladder to hold it tight.  So we had a safer bridge for us to walk on while we were moving the roof deck T&G materials. Since we have this bridge, it was much easy for us the put the T&G on top of the shed. By the time we finished moving the T&G, it was already dark. We will screw the T&G down tomorrow and cut the two small pieces of T&G for 2 corners.


 When we went back inside our trailer, it was only 7:30p.m., but we were too tired to continue to work. Before I took a quick shower, I pulled out the food for the hot pot to unfreeze.While I was preparing my food, Tom gave Odie and Ben Ben a shower. After he had done, I dried both of the cats, so Tom could continued to take the shower.